How to prioritize which blocks get reflown first when flight hours are limited

A cleared hillside with tree stumps and brush, backed by intact forest.

Most programmes don't have the hours to fly every block under contract in the same window. A fixed-wing pass or a drone contractor's day rate adds up fast once you're covering several hundred hectares across scattered units, and weather closes the window further every season. So before the plane or the drone crew ever gets scheduled, someone has to decide which blocks fly first, which fly later, and which get pushed to a walked sample if the hours run out entirely.

That decision shouldn't be made the morning of, standing in a parking lot looking at a spreadsheet. It should be built in advance, using what you already know about each block.

Start with the reporting clock, not the biggest acreage

The instinct is to fly the largest blocks first because they represent the most planted stems. That's backwards if your contract has a stocking report due on a fixed date. A 40-hectare block with a milestone payment or a regulatory filing due in three weeks outranks a 200-hectare block with a deadline eight months out, every time. Pull your contract dates before you pull your acreage numbers. Sort blocks by how soon you owe a number to the fund manager or the agency, and let that sort drive the first pass of the flight list.

Rank by exposure, not hectares planted

Once the deadline-driven blocks are queued, the next cut is financial exposure: what does it cost you if a block's survival rate is worse than expected and nobody finds out until next year? A block planted with a drought-sensitive species on a south-facing slope with thin soil carries more risk than a block of the same size planted with a hardier mix in a sheltered draw. Blocks that were replanted once already, blocks where the planting crew flagged a rough establishment season, and blocks where the beat-up cost per hectare is high because seedlings or labor are scarce this year should all move up the list ahead of blocks where a miss costs you very little to fix.

This is where a lot of contractors still guess, because the alternative is walking every block to check it before deciding whether it's worth a flight. That's the exact labor the flight is supposed to replace. A stocking check that counts every seedling from a single annual pass, rather than relying on a walked sample to estimate where the gaps are, gives you a consistent basis for ranking blocks against each other instead of ranking them on gut feel from whoever drove past last.

Use what the ground crews already told you

Pull together whatever field notes, planting crew reports, or site visit logs exist from the season before you touch the flight schedule. A crew that mentioned standing water, a washout, a frost event, or unusual deer browse on a specific block has already done part of your triage for you. Fly those blocks early so you have the answer in hand before the reporting deadline forces your hand.

Blocks with no flags, solid planting-day conditions, and a forgiving species mix are the ones that can safely wait for a second pass later in the flight season, or get covered on a lighter sampling basis if hours run out entirely.

Build the list before the window opens

Flight windows are short and weather-dependent, so the triage work needs to happen while you're still booking the crew and the plane, well ahead of the actual flight day. A simple ranked list, deadline first, exposure second, field flags third, gives whoever is booking the flight hours a clear order to work down instead of a negotiation every time a new request comes in. When hours run short at the end of the window, the blocks that drop off the list should be the lowest-risk, lowest-stakes ones you chose in advance, not whichever block happened to get overlooked.

If you're building that ranked list by hand every year from field notes and guesswork, a per-block stocking check built around a sub-10cm annual flight is worth a look at how Reforestation Monitor handles the count and the gap mapping once the flight is done. Flying the right blocks first only pays off if the count that comes back tells you exactly where the beat-up planting needs to happen.